CASE STUDIES

What became of those situations.

Six documented stories across the four situations, all to the same structure and with figures on economics and resilience.

Starting pointDecisionArchitectureMigrationResult
Proven where downtime is not an option.
MEKU Technologie
Modefachschule
Presto Gruppe
German Federal Government
Zwilling J.A. Henckels
Schnittger Architekten + Partner
SIX CASES IN DETAIL

Every case to the same structure.

01 — RESILIENCE & REGULATION · FINANCE

MCE Bank: core infrastructure rebuilt across two data centers, with no single point of failure.

What we did

Several core components had reached end of support, and the architecture had no redundancy. In an outage there would have been no failover. We rebuilt the infrastructure across two sites, every step inside the tight maintenance windows and documented to audit standard. At the end there was a jointly reviewed stability record with figures.

2data centers with a metro cluster
12 monthsrebuild while the bank kept running
0single points of failure left
MCE Bank
02 — RESILIENCE & REGULATION · AVIATION

ACM AIR CHARTER: Proxmox and Ceph brought back into support, without stopping flight operations.

What we did

The platform ran stably, but several major versions behind the supported release. In an EASA-regulated environment that means no security updates and no escalation path, and so it becomes a compliance issue. Charter, AOG standby and maintenance run around the clock, and there was no maintenance window. We updated in verified intermediate steps, took nodes out of the cluster one at a time and migrated the machines live while doing so. On the storage side, data integrity came before speed.

2 weeksfrom legacy to current
0maintenance windows
24/7flight operations kept running
ACM AIR CHARTER
03 — PLATFORM & VENDOR CHANGE · CONSTRUCTION

Hanebutt Group: from VMware to Proxmox VE in six weeks, run by their own team.

What we did

The new VMware licensing turned a question of cost into a question of dependence. The Hanebutt Group chose Proxmox VE but did not yet have the specialist knowledge in house. We built the platform together with them and trained the team along the way, so that it could take over operations itself after six weeks.

6 weeksfrom decision to operations
Proxmox VEtarget platform
Own teamoperations after handover
Hanebutt Gruppe
04 — PLATFORM & VENDOR CHANGE · CHAMBER OF COMMERCE

IHK Düsseldorf: an end-of-life platform replaced over a single weekend.

What we did

The virtualization platform was at the end of its lifecycle, while member administration, examination processes and digital services for 80,000 member companies had to stay available. For a public institution with a duty to serve, a standstill of several days is not an option. We prepared for four weeks and then carried out the switch over one weekend.

1 weekendfor the cutover
80,000member companies affected
4 weeksof preparation beforehand
IHK Düsseldorf
05 — CLOUD STRATEGY & COST · STAFFING SERVICES

START NRW: the operating load handed over, without losing authority over data and infrastructure.

What we did

After a restructuring the IT was fragmented, and knowledge left the company with the IT manager. The obvious answer would have been full outsourcing, and that was exactly what they did not want. We consolidated the landscape to a sensible size, left the infrastructure in the company's ownership and set up an operating model with clear roles. Compliance evidence for ISO 9001, SCP and AZAV can be produced from the system ever since.

26 monthsconsolidation and building operations
28branches across North Rhine-Westphalia
Ownershipinfrastructure stays in house
START NRW
06 — M&A, CARVE-OUT & RESTRUCTURING · AUTOMOTIVE

MEKU Group: an IT carve-out under insolvency conditions, every subsidiary ready to hand over.

What we did

After the insolvency the subsidiaries still hung off a shared Active Directory, SAP and network. For buyers that was a deal breaker. We separated the shared services step by step, simulated every separation in the lab beforehand and let production keep running throughout. When the previous IT provider dropped out in the middle of the process, we moved the infrastructure into a neutral data center within a few days.

18 monthsto the last handover
0production outages
Every subsidiaryable to run on its own
MEKU-Gruppe
FURTHER TRANSITIONS

More projects, the same care.

The same way of working in other industries and at other scales. You get the full reports in the initial call.

Consumer goodsZWILLING J.A. Henckels

Years of acquisitions had left an inconsistent IT landscape. Instead of optimizing locally again, everything moved to a global platform with central control, and identities were unified across the group.

2 years · worldwide
ManufacturingPresto Humus

Several plants with no viable broadband connection. Connected over satellite links, production and office networks cleanly separated, on a vendor-independent platform.

6 months · several sites
Mechanical engineeringSteyr Motors

The storage platform became unstable while individual test runs were going for weeks at a time. Replaced during live testing, without losing a single measurement series.

4 weeks · no downtime
Mechanical engineeringMTS Maschinenbau

International growth and an acquired site overwhelmed an IT landscape that had simply grown. Architecture, central services and the operating model were rebuilt, without stopping production.

12 months · several continents
NEXT STEP

Your transition, the same structure.

Starting point, decision, architecture, migration, result: that is how we will tell your case too. First we work out in the initial call whether it is a fit.

ENTRY POINT

Initial call: the diagnosis

30 minutes, no obligation: the situation, the timing, the environment.Book a call