SITUATIONS

It rarely starts
with technology.

It starts with a renewal quote at three times the price, a cloud bill nobody can explain any more, an acquisition with a fixed date, or a finding from an audit. Four situations, one pattern: a large change that has to pass through live operations.

Platform & vendor changeCloud strategy & costM&A & restructuringResilience & regulation
01 — FOUR SITUATIONS

Four situations we see every week.

A–01ENTRY POINT · FIXED PRICEServer chassis with 24 drives in a rack, an uninterruptible power supply above it

Platform & vendor change

“Our vendor has changed the rules: prices, licensing model, roadmap. Now we have to look at moving seriously.”

Your vendor changed the rules, not you. We assess your options: stay, move or reduce. And if you move, we do it before the renewal date decides your negotiating position. What changed at VMware and when a move pays off is on the page about the VMware exit. If Proxmox VE is the target platform: this is how we introduce and run it.

Typical triggersVMware and Veeam pricingHypervisor changeHardware end of lifeRenewal datesVendor lock-in
VMware Exit Assessment →
A–02ENTRY POINT · FIXED PRICEPlant design on a screen, a workstation in the background

Cloud strategy & cost

“Our cloud bill grows faster than our business. We need a solid answer on which workloads should run where.”

Egress charges, questions of sovereignty, steady loads on elastic infrastructure: we cost out what you have and tell you what stays in the cloud and what belongs back on your own hardware.

Typical triggersHigh cloud spendRepatriation and private cloudWorkload placementDependence on a cloud or MSPNo way out
Cloud Exit Assessment →
A–03ENTRY POINT · FIXED PRICEA mobile crane lifting an air conditioning unit off the roof of an office building

M&A, carve-out & restructuring

“We have to separate or merge IT landscapes, under time pressure and without putting operations at risk.”

A carve-out to a fixed date, a merger after an acquisition, a move to another site: we cut your business-critical systems apart again, migrate them and hand them over ready to run. Even when the date is already set.

Typical triggersCarve-out to a fixed dateMerger after an acquisitionA change of siteEnd of a data center or lease contractConsolidating a landscape that grew
Datacenter Review →
A–04ENTRY POINT · FIXED PRICEFiber patch panel with labeled patch cables

Resilience & regulation

“The environment has grown, the documentation lags behind. And the audit asks for evidence we cannot produce like this.”

Old systems out of support, single points of failure, patchy documentation: we bring your environment to a state that stands up to the real thing and to the auditor. NIS2, DORA and BSI make that evidence mandatory.

Typical triggersSystems out of supportSingle points of failureNo high availabilityPatchy documentationNIS2 / DORA / BSISovereignty
Resilience Assessment →

The one situation that needs no trigger: this is the only one that justifies a project of its own even without a change coming up. It makes your environment demonstrably robust and shows you the next decision before it presses.

The diagnosis opens every initial call.

What is coming up for you, what is driving it, and by when do you have to decide? Only after that do we talk about technology.

NEXT STEP

Your situation is not listed?

Consolidation, a rebuild, a question of sites: that is often the solution already, and behind it sits one of the four situations. In the initial call we work out which.

ENTRY POINT

Initial call: the diagnosis

30 minutes, no obligation. The situation, the timing, the environment. Afterwards both sides know whether this is a fit.Book a call