Wismar University

Around 500 machines on ten nodes. A shared platform with separate environments for three faculties.

THE CUSTOMER

Wismar University’s central data centre serves three faculties. Shared infrastructure needed to coexist with separate areas of responsibility.

2025
SCOPE AND OUTCOME

The project at a glance.

PROJECT PERIOD · 2025
virtual machines on ten nodes
500
petabyte of raw capacity across two fire compartments
1
01

The challenge.

Three faculties needed a shared platform for around 500 virtual machines. Hardware and operational expertise were to be pooled without mixing research data, teaching systems and administration. Each faculty’s requirements had to be brought together in one architecture.

THE REQUIREMENT

One shared platform. Networks, storage and permissions remain separate for each faculty.

02

Our contribution.

We supported the project from requirements gathering and procurement through implementation and acceptance. Together with the university’s data centre team, we built a shared Proxmox and Ceph platform with separate resources for each faculty.

  • 01

    Collected requirements from all participants, from central services and faculties to operations, before technical planning began

  • 02

    Designed a ten-node cluster across two fire compartments. The network infrastructure shares neither nodes nor physical routes

  • 03

    Planned separation at three levels: dedicated network segments, storage pools and permission groups per faculty

  • 04

    Represented the university during procurement, formulated technical requirements and assessed bids

  • 05

    Built two-stage backup with Proxmox Backup Server. The first stage is close to the cluster; the second is in another building

  • 06

    Supported implementation and failure tests with the data centre team through final acceptance

03 · THE BENEFIT FOR THE CUSTOMER

The university pools infrastructure and operational expertise. Faculties share capacity while retaining separate networks, storage areas and permissions.

TODAY

Operated by the university data centre team

The university’s data centre team operates the platform and allocates resources to the faculties. Around 500 virtual machines run on ten nodes. Two-stage backup using Proxmox Backup Server complements the environment spread across two fire compartments.

PROJECT AND TECHNOLOGY

Implementation in detail.

01

Shared data centre

The target platform serves three faculties with around 500 virtual machines. Proxmox VE and Ceph run on ten nodes across two fire compartments. Raw capacity exceeds one petabyte.

02

Separate environments

Each faculty has its own network segments, storage pools and permission groups. The central data centre can provide shared resources while technical responsibilities and access remain separate.

03

Networking and backup

Redundant network paths share neither switches nor routes. Proxmox Backup Server provides two backup stages: one near the cluster and another in a separate building.

04

Testing and operations

Individual hosts and an entire fire compartment were shut down for failure tests. Recovery time and data-loss objectives were defined and checked. Implementation and acceptance took place with the data centre team, which now operates the platform.

THE FIRST STEP

Facing a similar task?

We discuss your circumstances and identify which experience from this project is relevant to yours.

A short description is enough. You do not need technical documents for the initial enquiry.