Presto Humus

Three sites on the corporate network, two without broadband.

THE CUSTOMER

Presto Humus operates three sites in the circular economy. Broadband was unavailable at two production sites.

2026
SCOPE AND OUTCOME

The project at a glance.

PROJECT PERIOD · 2026
sites on the corporate network
3
paths per plant: Starlink, with 5G as fallback
2
01

The challenge.

Digitalisation required three sites to access shared systems, but two production sites lacked adequate broadband. Connectivity, platform and desktops had to work together to make the plants operational under these conditions.

THE REQUIREMENT

The required systems must remain accessible even at sites without broadband.

AT THE PRESTO HUMUS PLANT, BETWEEN THE CONVEYORS
02

Our contribution.

We designed site connectivity together with the central working environment. Starlink, encrypted tunnels and 5G connected the plants; Proxmox, central RDP sessions and a new Microsoft environment provided the applications.

  • 01

    Recorded what was actually running at each site, from applications and data flows to network connections

  • 02

    Connected both plants to the main network through Starlink and encrypted tunnels, with 5G as a second path

  • 03

    Set up a central RDP environment. Sessions run in the data centre; only the display output travels over the site connection

  • 04

    Built the Proxmox VE platform, a new Windows domain and Microsoft 365 in parallel

03 · THE BENEFIT FOR THE CUSTOMER

All three sites can access shared applications. The production sites are connected without having to wait for conventional broadband deployment.

TODAY

Operations together with Sysfacts

The internal team directs IT; Sysfacts supports infrastructure operations and looks after Proxmox, backup and patch management. The shared platform supplies applications to all three sites.

PROJECT AND TECHNOLOGY

Implementation in detail.

01

Sites and connections

One main site and two production sites needed to work together. The plants without broadband were connected using Starlink and encrypted tunnels. Each also has 5G as a second connection.

02

Platform and backup

A Proxmox VE environment with Ceph and Proxmox Backup Server was built in parallel. A new Windows domain based on Windows Server 2025 and Microsoft 365 complete the platform.

03

Centralised desktops

RDP sessions run in the data centre. The site connection carries display output rather than running the full applications on remote desktops.

04

Use in production

The connections support the planned SAP transactions in daily use. All three sites are on the corporate network. The internal team manages the platform itself.

THE FIRST STEP

Facing a similar task?

We discuss your circumstances and identify which experience from this project is relevant to yours.

A short description is enough. You do not need technical documents for the initial enquiry.