Plan the site and the move
We assess requirements for capacity, connectivity, power and operations. Contract end dates, lead times and parallel running costs are part of the plan.
An agreed relocation plan with technical prerequisites.
A site move involves more than transporting hardware. We plan connectivity, the target environment and the migration sequence together, then relocate your systems within the agreed timeframe.
Discuss your requirements
Which systems and data need to move together?
When will circuits, rack space and access actually be available?
What can be reused, and where does replacement make sense?
We assess requirements for capacity, connectivity, power and operations. Contract end dates, lead times and parallel running costs are part of the plan.
An agreed relocation plan with technical prerequisites.
We coordinate technical interfaces with operators and providers, set up infrastructure and test connections. Application dependencies determine the migration groups.
A prepared target environment and tested transfer paths.
We carry out the move with your IT team, check applications, backup and monitoring, and update documentation. The old site is technically closed down after approval.
Migrated systems and defined operations at the new site.
Relocation and modernisation can fit together. We also assess whether two separate steps reduce risk and time pressure. Not every change needs to happen in the same cutover window.
We planned and coordinated the technical separation. Six companies received their own data environments while production continued.
View the project
The internal team operates the environment with support from a resident engineer.
View the project
We discuss your starting point, fixed deadlines and the responsibilities of your internal IT team. Together, we establish the contribution Sysfacts can make.
A short description is enough. You do not need technical documents for the initial enquiry.